Project
Prefab Labor Camp in Saudi Arabia Folding Container House Short Time Installation
Aug 19 , 2021

A prefab labor camp project was completed in Saudi Arabia and built entirely from a combination of folding container house. 

The total area is 3000 m². The choice of folding container house can significantly shorten the construction period, and more flexibility and mobility. 

The installation time of folding container house is only about 5 minutes. 

Saudi is hot and dry, so we used hot and dry resistance sandwich panel for the roof and wall.

container house labor camp

Send A Message
welcome to SOEASY
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

about

contact